Volume 19 No 1 (2021)
 Download PDF
COST ANALYSIS FOR DAM TOE SMALL HYDRO POWER PLANT
Ullas Dixit, Mr. Anurag Kumar,
Abstract
The selection of the appropriate hydro turbine is critical for a hydropower site, as it depends on the site's specifications and affects civil engineering requirements. This study aims to optimize hydro turbine selection to minimize the overall plant cost for a typical dam toe site with 20 m head and 10,000 kW capacity. Three turbine types were compared: tubular propeller, tubular Kaplan, and vertical semi-Kaplan. Since the turbine type affects overall plant cost, the costs of the powerhouse, turbine, generator, and auxiliaries were analyzed for each option. The tubular propeller turbine contributed the lowest plant cost and is thus recommended for this site.
Keywords
The selection of the appropriate hydro turbine is critical for a hydropower site, as it depends on the site's specifications and affects civil engineering requirements.
Copyright
Copyright © Neuroquantology

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.

Articles published in the Neuroquantology are available under Creative Commons Attribution Non-Commercial No Derivatives Licence (CC BY-NC-ND 4.0). Authors retain copyright in their work and grant IJECSE right of first publication under CC BY-NC-ND 4.0. Users have the right to read, download, copy, distribute, print, search, or link to the full texts of articles in this journal, and to use them for any other lawful purpose.