Volume 20 No 9 (2022)
Download PDF
PRODUCTIVITY IMPROVEMENT INTRODUCING LEAN PRINCIPLES IN MULTI-MODEL ASSEMBLY LINE
Ashish, Raj Kumar Duhan, Ravinder Kundu
DOI: 10.14704202220944165
Abstract
Manufacturing industries are very much dependent on the strategy which is adopted by the
manufacturers to improve their performance in such a highly competitive environment. Sustaining the
business performance and improving it in continual mode is another matter of concern for the business
managers.The primary focus of the proposed technique to improve the production of the company. In
spite of this optimized utilization of resources, eliminating wastes and reduction in cycle times are main
parameter for proper production. The research is based on lean principle and DMAIC to boost up the
production through the identification and elimination of waste. The cycle time for the product is
reduced up to 10.6 % and production per shift increase up to 11.9 %. In the same way, production per
man is increased up to 11.9 % & lead time reduced to 3.6 %. The different quantitative outcomes, a
number of unique resultshave also achievable via improvement activitiesas improvement in 5S culture,
increased morale and better understanding of lean methodology
Keywords
Productivity improvement, Lean manufacturing,Processing waste,HLLS (Head Lamp Leveling Switch)
Copyright
Copyright © Neuroquantology
Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Articles published in the Neuroquantology are available under Creative Commons Attribution Non-Commercial No Derivatives Licence (CC BY-NC-ND 4.0). Authors retain copyright in their work and grant IJECSE right of first publication under CC BY-NC-ND 4.0. Users have the right to read, download, copy, distribute, print, search, or link to the full texts of articles in this journal, and to use them for any other lawful purpose.